The Downeaster is a 145-mile (233 km) regional passenger train service, managed by the Northern New England Passenger Rail Authority (NNEPRA, created by the State of Maine), and operated by Amtrak. Named for the Down East region of Maine, the train runs from North Station in Boston, Massachusetts, to Brunswick, Maine, with 10 intermediate stops. The train also operates five daily round trips between Portland and Boston, three of which continue to Brunswick.

In fiscal year 2013, the Downeaster carried 560,000 passengers.


Video Downeaster (train)



Route

The Downeaster uses the MBTA's Lowell Line from Boston's North Station to Wilmington, the Wildcat Branch to Wilmington Junction, and the Haverhill Line to the Massachusetts-New Hampshire state line. From there to Portland, it uses the Pan Am Railways Freight Main Line. All of these lines were once part of the Boston and Maine Railroad; the part south of Wilmington Junction was once the mainline and a branch of the Boston and Lowell Railroad, and the rest was the mainline of the B&M.

If the Downeaster were to run solely on the Haverhill Line, it would conflict with the local commuter rail service, since the Amtrak train makes no stops between Woburn and Haverhill. By using the Wildcat Branch to cross between the Lowell and Haverhill lines, the Downeaster can pass a Haverhill train.

Connections

  • Portland: Concord Coach Lines service to Bangor
  • Haverhill: MBTA Haverhill Line commuter rail
  • Woburn: MBTA Lowell Line commuter rail; Massport Logan Express bus to Logan International Airport.
  • Boston: MBTA Green Line and Orange Line rapid transit; Fitchburg Line, Lowell Line, Haverhill Line, and Newburyport/Rockport Line commuter rail; 4 local bus, and water taxis

The Downeaster is separated from the rest of Amtrak's system because there is no link between Boston's train stations. Downeaster passengers continuing south from Boston on Amtrak may take MBTA subway trains to Back Bay or South Station.

Services

The Downeaster offers two classes of service: Reserved Coach and Business Class. All seats have electrical outlets, and Amtrak Connect (Amtrak's Wi-Fi (wireless internet) service) is available. All trains have a cafe car that sells snacks, light meals, soft drinks, and alcoholic beverages.

Some Downeaster trains carry volunteers, coordinated by Trainriders Northeast, to inform passengers about destinations, attractions, and transfers.


Maps Downeaster (train)



Consist

The Downeaster typically operates with four Amfleet I coaches and an Amfleet business/cafe coach. Motive power is provided by a GE Genesis P42DC on the northbound end of the train. A converted F40 non-powered control unit runs on the southbound end of the train. The sole remaining original 1955 Great Dome railcar is typically provided during the Autumn season for leaf peeping.


Amtrak Downeaster Train Service - Visit Exeter NH
src: visitexeternh.com


History

Previous service (1989 and earlier)

The Downeaster follows the route historically used by the Pine Tree and Flying Yankee trains that traveled from Bangor to Boston and were operated jointly by the Boston & Maine Railroad and Maine Central Railroad. All passenger operations between Portland and Boston ceased in 1965.

Planning for new service (1990-95)

At the urging of Maine's congressional delegation, Amtrak in 1990 estimated the cost of creating passenger rail service at about $50 million: $30 million for infrastructure improvements and another $20 million for equipment. The following year, Amtrak agreed to provide the equipment at no charge to the State of Maine. Earlier in that same year, the Maine State Legislature adopted its first citizen-initiated bill, the "Passenger Rail Service Act", which was endorsed by the Maine DOT and signed by the governor. In 1992, Maine voters approved a $5.4 million rail bond for right-of-way improvements, and $60,000 was granted to the Maine DOT to design a Portland intermodal terminal. Later that year, Congress approved $25.5 million for more right-of-way improvements, and 1993 saw an additional $9.5 million in track improvements. By the end of 1994, total appropriations for infrastructure had reached $38.6 million. In 1995, then-governor Angus King and Commissioner of Transportation John Melrose ordered the creation of a passenger rail authority; TrainRiders/Northeast, led by Chairman Wayne Davis , worked with the state Chamber of Commerce and industry, Maine DOT, and others to convince the Maine Legislature to create the Northern New England Passenger Rail Authority in August.

Start of service (1996-2001)

Service was initially expected to start in the 1990s. Negotiations between NNEPRA, Amtrak, and Guilford Industries (now Pan Am Railways) began in 1996, but began to fail over many factors, including equipment weight and speed limits. In December 1998, a speed limit of 80 miles per hour (130 km/h) was agreed upon; the following year, the Federal Surface Transportation Board approved a limit of 79 miles per hour (127 km/h). Most right-of-way improvements were complete in 2000, but the following year, start-up was delayed again when Guilford refused to allow Amtrak to test track modulus or run trains faster than 59 miles per hour (95 km/h). The Downeaster made its first run on December 15, 2001.

Service improvements (2002-11)

In August 2007, top speeds were increased from 60 miles per hour (97 km/h) to 79 miles per hour (127 km/h), cutting 20 minutes from trips between Portland and Boston. The first expansion of Downeaster service came that month, when the improvements made it possible to increase from four to five daily round trips from Portland to Boston.

In 2011, the Downeaster was the first Amtrak train to offer free Wi-Fi service and e-ticketing.

Brunswick extension (2006-12)

Service to Brunswick was originally intended to begin within five years of the Downeaster's 2001 launch, but was delayed by lack of funding and other obstacles. Ground was broken in October 2008 for the Brunswick Maine Street Station, a retail development that included shops, condominiums, an inn, and office space. In January 2010, NNEPRA received a $35 million grant from the American Recovery and Reinvestment Act of 2009 for track and signal upgrades for the Portland-Brunswick line. Pan Am Railways began work on the line in summer 2010, and on May 14, 2012, the platforms in Brunswick and Freeport were declared complete. Service began on November 1, 2012.

The extension to Brunswick led to the construction of an enclosed layover facility there, just west of the station; trains had been stored outdoors in Portland. The facility opened in November 2016, permitting a third daily Brunswick-Boston trip. NNEPRA announced plans for the facility in 2013, with construction slated to run from summer 2013 until late 2014, but local opposition delayed the project. Neighbors of the planned location demanded further environmental studies, saying they believe the facility would hurt nearby areas. State politicians became involved; Governor Paul LePage, concerned about job creation at Brunswick Landing, suggested alternate locations in eastern Brunswick. Several Democratic state legislators asked NNEPRA to build in an existing rail yard in South Portland, and to focus on the "core product" of Boston-Portland service instead. Legal challenges to the facility ended in January 2016.

2015 winter and track work (2014-16)

The Downeaster's ridership, finances, and performance suffered in the first half of 2015 because of an exceptionally brutal winter and a subsequent large-scale tie replacement project funded by the NNEPRA. During its fiscal year 2015 (July 2014 to June 2015), Amtrak cancelled 488, or 13 percent, of its scheduled Downeaster trains. The trains that ran saw an on-time percentage of 30%, less than half the national average of 71%; during the tie replacement, none ran on time in May and 8% in June. Ridership dropped 18.2% (nearly 100,000 fewer riders) from the previous fiscal year.

The Downeaster resumed its full schedule on August 1, 2015, following the completion of the track repairs. By December 2015, the Downeaster was up to a monthly on-time percentage of 86%, well above the national average.


Downeaster Stock Photos & Downeaster Stock Images - Alamy
src: c8.alamy.com


Ridership and finances

Between December 2001 through 2005, annual ridership ranged from 250,000 to 300,000 passengers. Since 2005, ridership has increased an average of 13.1% per year, excluding calendar year 2009, which saw ridership shrink by 4.7%. In fiscal 2008, the Downeaster was Amtrak's fastest-growing service, with ridership up 22.9% from the previous year. In fiscal 2011, ridership topped 500,000 for the first time. Fiscal 2013 was the Downeaster's busiest year. Compared to fiscal 2012, ridership rose 6.1% to 559,997 passengers (about 1,530 passengers a day), while ticket revenue rose 6.1% to $8.2 million. The extension to Freeport and Brunswick is expected to boost ridership by 36,000.

The line's busiest station is North Station in Boston. The busiest station in Maine is the Portland Transportation Center, while Exeter is New Hampshire's busiest.

In fiscal year 2012 the Downeaster generated $8.1 million in revenues, of which $7.4 million was from ticket sales. As of 2013, operational costs were around $15 million annually, $5.6 million of which is covered by Congestion Mitigation and Air Quality (CMAQ) funding, $8.1 million in revenues, and $1.8 million in operating subsidy from the State of Maine. The state governments of Massachusetts and New Hampshire do not pay to operate the train. 58% of the overall ridership travels to or from the state of Maine.


The Amtrak Downeaster Could Offer Service to Rockland Next Summer
src: wjbq.com


Economic impact

A 2008 study by the Chicago-based Center for Neighborhood Technology suggested that the Brunswick extension, combined with commercial developments along the "Downeaster Corridor", could generate several billion dollars in construction investments plus $55 million annually in tax revenue for the state of Maine.

In 2013, the Northern New England Passenger Rail Authority estimated that the Downeaster has an annual economic impact of $12 million from visitors to Maine, and directly or indirectly employs 200 people.


Downeaster Stock Photos & Downeaster Stock Images - Alamy
src: c8.alamy.com


Plans

Speed and service frequency (2009-present)

Amtrak plans to operate one or two additional round trips between Portland and Boston (six or seven round trips daily). In 2009, the rail authority applied for federal stimulus money to increase train speeds--enough to cut 10 to 12 minutes off travel time--and increase the number of daily round trips from five to seven. No money was ever awarded for this project.

In 2017, NNEPRA intends to construct a 4-mile (6 km) passing track on the 30-mile (48 km) single-track section of line between Portland and Brunswick. Called the Royal Junction siding project, it will enable five daily trips to Brunswick, up from the current three (which began in November 2016 after the Brunswick layover facility had been completed).

The route the Downeaster follows is designated by the Federal Railroad Administration as a potential high-speed rail corridor. If the Northern New England Corridor were funded and completed as proposed, passenger trains would travel at up to 110 miles per hour (177 km/h) between Boston, Portland, and Lewiston.

Kennebunk station

In May 2014, NNEPRA agreed to add a station stop at Kennebunk, Maine. Like Old Orchard Beach, it will be a seasonal stop, open from April to October. Initial plans called for a temporary platform to be erected in 2016, with a permanent platform constructed with $300,000 in town money and $800,000 in state money for 2017 or 2018. Part of the former Boston & Maine depot building, used for passenger service from 1873 to 1965, will be leased for use as a waiting area. Service did not begin in 2016 or 2017.

Lewiston-Auburn extension

In April 2013, NNEPRA announced that a plan to expand passenger rail service to Lewiston-Auburn, Maine's second-largest metropolitan area, would be released later in the year. As of September 2016. the question of whether the line might be built remains unsettled.

Rockland service

Until 2015, the Maine Eastern Railroad offered seasonal excursion service to Rockland, Maine which connected to the Downeaster at Brunswick. In October 2017, NNEPRA announced plans to extend one weekend Downeaster round trip to Rockland between Memorial Day and Labor Day beginning in 2018. Intermediate stops would be made at Bath, Wiscasset, and Newcastle.


MBTA Lowell Line / Amtrak Downeaster Train at West Medford, MA RR ...
src: i.ytimg.com


See also

  • Railroad history of Portland, Maine

FAST AMTRAK DOWNEASTER TRAINS !!! - YouTube
src: i.ytimg.com


References


FAST AMTRAK DOWNEASTER TRAINS !!! - YouTube
src: i.ytimg.com


External links

  • Official website
  • Amtrak - Routes - Northeast - Downeaster
  • TrainRiders Northeast
  • Northern New England Passenger Rail Authority

Source of the article : Wikipedia

Comments
0 Comments